Town of Wamsutter Water Appurtenances Project

Engineering services included design and production of construction plans and specifications.  Prior to construction, topographic surveys were completed to supplement mapping and field investigations done to determine the extent of the project

Construction incorporated water main installation; with the removal and replacement of concrete curb and gutter, asphalt paving, sidewalk; fire hydrant replacement, adjustment and repairs throughout the Town.  In addition, adjustment of two valve boxes and concrete collars; installation of two meter pits, meters and backflow prevention devices on existing services; installation of two new services one with an installation of a meter pit and one with a yard hydrant and replacement of an existing service.