Town of Sinclair - Lincoln Avenue Water and Sewer Replacement

EA performed surveying, design and preparation of construction drawings for this $1.8 million project completed in 2016.  In addition, our staff coordinated bidding and negotiations, contract management, construction review and project closeout. 

Scope included replacement of cast iron water mains that were installed in the 1920’s.  These mains had leaks and valve failures requiring numerous repairs in the last several years.  Also included was replacement of existing sanitary vitrified clay (VCP) sewer mains that required multiple cleanings per year to maintain flow.  Multiple yearly cleaning with a sewer jet damaged the pipe as evidenced by multiple chunks of VCP coming out with the roots, sediment and other deleterious material.